Spire Healthcare Southampton
THEATRE 5
Lavingtons acted as Quantity Surveyors on the enabling works contract in connection with the installation of a modular building to provide a 5th Operating Theatre at their Hospital in Southampton.
Together with some internal alterations the enabling works consisted of the construction of a steel frame at the rear of the building on to which the modular building was installed.
PreviousNext
All Projects
All Projects
All Projects
All Projects
All Projects
All Projects
All Projects
All Projects